Know about PEB
Pre-engineered Steel Buildings are designed to suit very specific customer requirements Upon finalizing the requirements, the Primary and Secondary structures are factory-prepared and are assembled at site. The concept is a huge success story in The U.S. and Europe and has made inroads into Indian market less than a decade back. However, most of the production units coming up today are Pre-engineered Steel Buildings.Pre Engineered Building in vadodara We are well acquainted with the custom cats and rules & regulation of shipment.
Product Weight
Lighter ( 30% than conventional steel)
STRUCTURE WEIGHT
Product Weight
Heavier
Quick and Efficient
Specialized computer analysis and design programs optimize material required.
DESIGN
Slow and Tedious
Substantial engineering and detailing work is required
less Responsibility
Single source of responsibility is there because all the job is being done by one supplier.
SAFETY AND RESPONSIBILTY
Multiple responsibilities
Multiple responsibilities can result in question of who is responsible when the components do not öt in properly, insufficient material is supplied
Short Period Delivery
Delivered in Short Period ( 6 to 8 weeks)
DELIEVERY
Longer Period Delivery
Require Longer Period (20 to 26weeks)
Simple and Easy to use
Simple design, easy to construct and light weight
FOUNDATION
Heavy Foundation Required
Extensive, heavy foundation required
Standard Components Connection
Since the connection of components is standard, erection is faster.Erection is provided at the sit by the manufacturer
ERECTION SIMPLICITY
Normal Components Connection
The connections are normally complicated and differ from project to project.There has to be separated allocation of labor for the purpose of erection
Faster & Cost effective
Cost effective , faster endless number of equipment same required for erection.
ERECTION COST & TIME
Time-consuming & Costlier
Costlier (20% than PEB ) , time-consuming and heavy equipments are required for erection.
Low Price as compare to CSB
Price per square meter may be as low as by 30% than the conventional building..
OVERALL PRICE
Higher price as compare to PEB
Higher price per square meter